accessInformation:
|
Update History:
2019-05-07. Updates as per TCA Q4. SP
2018-11-01. Added Hills Phase 1 MF. SP
2018-07-18 Added CB in SSR phase 20B. PL
2018-02-26, changed FAC for Y to N for features in FS Ph5. wgb
2018-02-05, add catch basin in SSR Ph14 as shown in CAD base. wgb
2017-10-16. added points in HH Phase 3D as per FAC. wgb
2017-09-29, changed phase name in HH from 3D to 3D O/S as per FAC.wgb
2017-09-06 Updates in Sunset Ridge Phase 19B. PL
2017-09-05 Updated CB in FS phase 7, 8 and Heritage Hills phase 3D. PL
2017-06-01, add metadata and thumbnail. wgb
2016-11-08, added Riversong Phase 8. wgb
2016-10-19, added Sunset Ridge Phase 14. wgb
2016-10-14 Added features in Sunset Ridge Phase 19A PL
2016-07-19 Added catch basins in Fireside Phase 5. PL
2015-10-29, added 2 missing cb to match CAD in FS PH3A. wgb***
2015-01-07 added new storm data to Willows phase 1 SiM*****
Update: 20140807, added features for Fireside Ph2 data integration on RN1421. WGB***
Updated on 2014-06 by WGB, added SSR-PH13, 23 features.***
March 5, 2014. Added new catch basin lead at intersection of 5th Ave & 1st St as per Doug from Roads. SP***
February 04, 2014. FAC info updated for 2013. SP*** February 03, 2014 Riversong Phase 5 offsite data added. ST
***October 30, 2013.Fireside Phase 3 data addded. ST
***June 06, 2013. Riversong Phase 5 data addded. ST
*** 30 April 2013. Cochrane West phases 1A, 1B and 1C data entered ST *** |