{ "culture": "en-CA", "name": "", "guid": "", "catalogPath": "", "snippet": "Storm catch basins.", "description": "
Data is appended from CAD during data integration for each construction phase.<\/SPAN><\/P><\/DIV><\/DIV><\/DIV>", "summary": "Storm catch basins.", "title": "Catch Basins", "tags": [ "Storm", "catch", "basin" ], "type": "", "typeKeywords": [], "thumbnail": "", "url": "", "minScale": 150000000, "maxScale": 5000, "spatialReference": "", "accessInformation": "Update History:\n2019-05-07. Updates as per TCA Q4. SP\n2018-11-01. Added Hills Phase 1 MF. SP\n2018-07-18 Added CB in SSR phase 20B. PL\n2018-02-26, changed FAC for Y to N for features in FS Ph5. wgb\n2018-02-05, add catch basin in SSR Ph14 as shown in CAD base. wgb\n2017-10-16. added points in HH Phase 3D as per FAC. wgb\n2017-09-29, changed phase name in HH from 3D to 3D O/S as per FAC.wgb\n2017-09-06 Updates in Sunset Ridge Phase 19B. PL\n2017-09-05 Updated CB in FS phase 7, 8 and Heritage Hills phase 3D. PL\n2017-06-01, add metadata and thumbnail. wgb\n2016-11-08, added Riversong Phase 8. wgb\n2016-10-19, added Sunset Ridge Phase 14. wgb\n2016-10-14 Added features in Sunset Ridge Phase 19A PL\n2016-07-19 Added catch basins in Fireside Phase 5. PL\n2015-10-29, added 2 missing cb to match CAD in FS PH3A. wgb***\n2015-01-07 added new storm data to Willows phase 1 SiM*****\nUpdate: 20140807, added features for Fireside Ph2 data integration on RN1421. WGB***\nUpdated on 2014-06 by WGB, added SSR-PH13, 23 features.***\nMarch 5, 2014. Added new catch basin lead at intersection of 5th Ave & 1st St as per Doug from Roads. SP***\nFebruary 04, 2014. FAC info updated for 2013. SP*** \nFebruary 03, 2014 Riversong Phase 5 offsite data added. ST\n***October 30, 2013.Fireside Phase 3 data addded. ST\n***June 06, 2013. Riversong Phase 5 data addded. ST\n*** 30 April 2013. Cochrane West phases 1A, 1B and 1C data entered ST ***", "licenseInfo": "" }