Description: Water valve dataset for the entire Town of Cochrane.Data is appended from CAD during data integration for each construction phase.W3 indicated that the following attributes should have the default values listed:Normal Position - OpenCasing Type - CCap Type - CClose Direction - Clockwise
Service Item Id: 7633cf3916ca4f74a9c5ac0b4f32b05d
Copyright Text: Update History:
2018-02-07, add features in TW Phase 4 for TCA. wgb
2018-02-06, add features in HH Phase 1MF for TCA. wgb
2018-01-19, added comments to 1 features to review TCA report Q3. wgb 2016-10-20, added RS Ph8. wgb
2016-10-17, added SSR Ph14. wgb
2016-10-14 Updates for Sunset Ridge Phase 19A and 19 O/S PL
2016-08-16 Added 3 new found valves PL
2016-07-20 Added valves in Fireside Phase 5 PL
20150205, added FS Ph4 features and FAC'd them. wgb***
Update: 20140807, added features for Fireside Ph2 data integration on RN1421. WGB***
Updated on 2014-06 by WGB, added SSR-PH13, 21 features.***
May 20, 2014. SIP 2013 updates. SP***
February 04, 2014. FAC info updated for 2013. SP***
October 25, 2013. Fireside Phase 3 data addded. ST*** ****October 17, 2013. Riversong Phase 7 data addded. ST
****July 19, 2013. Removed wat_val_589 as per request from W3 Manager. Attributes of removed valve: diameter = 400mm, install year = 2000, FAC date = 31/12/2001.SP
****June 17, 2013. Willows Phase 1 data addded. ST
****June 06, 2013. Riversong Phase 5 data addded. ST
Description: Water valve dataset for the entire Town of Cochrane.Data is appended from CAD during data integration for each construction phase.W3 indicated that the following attributes should have the default values listed:Normal Position - OpenCasing Type - CCap Type - CClose Direction - Clockwise
Service Item Id: 7633cf3916ca4f74a9c5ac0b4f32b05d
Copyright Text: Update History:
2018-02-07, add features in TW Phase 4 for TCA. wgb
2018-02-06, add features in HH Phase 1MF for TCA. wgb
2018-01-19, added comments to 1 features to review TCA report Q3. wgb 2016-10-20, added RS Ph8. wgb
2016-10-17, added SSR Ph14. wgb
2016-10-14 Updates for Sunset Ridge Phase 19A and 19 O/S PL
2016-08-16 Added 3 new found valves PL
2016-07-20 Added valves in Fireside Phase 5 PL
20150205, added FS Ph4 features and FAC'd them. wgb***
Update: 20140807, added features for Fireside Ph2 data integration on RN1421. WGB***
Updated on 2014-06 by WGB, added SSR-PH13, 21 features.***
May 20, 2014. SIP 2013 updates. SP***
February 04, 2014. FAC info updated for 2013. SP***
October 25, 2013. Fireside Phase 3 data addded. ST*** ****October 17, 2013. Riversong Phase 7 data addded. ST
****July 19, 2013. Removed wat_val_589 as per request from W3 Manager. Attributes of removed valve: diameter = 400mm, install year = 2000, FAC date = 31/12/2001.SP
****June 17, 2013. Willows Phase 1 data addded. ST
****June 06, 2013. Riversong Phase 5 data addded. ST
Description: Water valve dataset for the entire Town of Cochrane.Data is appended from CAD during data integration for each construction phase.W3 indicated that the following attributes should have the default values listed:Normal Position - OpenCasing Type - CCap Type - CClose Direction - Clockwise
Service Item Id: 7633cf3916ca4f74a9c5ac0b4f32b05d
Copyright Text: Update History:
2018-02-07, add features in TW Phase 4 for TCA. wgb
2018-02-06, add features in HH Phase 1MF for TCA. wgb
2018-01-19, added comments to 1 features to review TCA report Q3. wgb 2016-10-20, added RS Ph8. wgb
2016-10-17, added SSR Ph14. wgb
2016-10-14 Updates for Sunset Ridge Phase 19A and 19 O/S PL
2016-08-16 Added 3 new found valves PL
2016-07-20 Added valves in Fireside Phase 5 PL
20150205, added FS Ph4 features and FAC'd them. wgb***
Update: 20140807, added features for Fireside Ph2 data integration on RN1421. WGB***
Updated on 2014-06 by WGB, added SSR-PH13, 21 features.***
May 20, 2014. SIP 2013 updates. SP***
February 04, 2014. FAC info updated for 2013. SP***
October 25, 2013. Fireside Phase 3 data addded. ST*** ****October 17, 2013. Riversong Phase 7 data addded. ST
****July 19, 2013. Removed wat_val_589 as per request from W3 Manager. Attributes of removed valve: diameter = 400mm, install year = 2000, FAC date = 31/12/2001.SP
****June 17, 2013. Willows Phase 1 data addded. ST
****June 06, 2013. Riversong Phase 5 data addded. ST