Construction Phases (1)
Easements (2)
Abandoned Forcemains (4)
Sanitary Valve (6)
Sanitary Cleanouts (7)
Sanitary Manholes (8)
Forcemain Valve Chamber (9)
Sodium Hypochlorite (10)
Lift Stations (11)
Sanitary Locate Zone (12)
Sanitary Inlets (13)
Sanitary Syphons (14)
Sanitary Mains (15)
| CCC |
| FAC |
Sanitary Forcemains (16)
Town Power (19)
Town Fibre Access Points (20)
Town Fibre (21)
Town Fibre As-Builts (22)
Abandoned Storm Mains (24)
Catch Basins (25)
| CCC |
| FAC |
Storm Inlets (26)
Storm Manholes (27)
Outfalls (28)
Storm Sceptors (29)
Control Structures (30)
Catch Basin Leads (31)
Culverts (32)
Storm Drainage Routes (33)
Storm Mains (35)
| CCC |
| FAC |
Storm Ponds (36)
Trap Lows (37)
Weeping Tile (38)
Abandoned Water Mains (40)
Flushing Assembly (3022)
Water Vaults (41)
Water Facility (42)
Water Hydrants (43)
Hydrant Leads (44)
Reducers (45)
Counter Clockwise Close Direction Valves (202)
Normal Position Closed Valves (303)
Water Valves by Type and FAC Status (46)
| Butterfly Valve (CCC) |
| Butterfly Valve (FAC) |
| Check Valve (CCC) |
| Check Valve (FAC) |
| Hydrant Valve (CCC) |
| Hydrant Valve (FAC) |
| Main Valve (CCC) |
| Main Valve (FAC) |
| Pressure Reducing Valve (CCC) |
| Pressure Reducing Valve (FAC) |
Water Pump Stations (47)
Water Laterals (177)
Water Mains (48)
| CCC |
| FAC |
Water Reservoirs (49)
Pressure Zones (50)
Meter Chamber (51)
|