Description: This dataset details the location of all of the sanitary mains for the Town of Cochrane. Where dates where not available the assumption was made that it was as old as the mains that feed it. If there is no feeders, then it is as old as the neighbourhood it resides in.Data is appended from CAD during data integration for each construction phase.
Service Item Id: 584137686fb341158a743c9b0cdef912
Copyright Text: Update History:
2016-07-15 Updated main direction of flow in Sunset.PL
2015-03-27 Finished up Heritage Hills 3 A,C
Update: 20140807, added features for Fireside Ph2 data integration on RN1421. WGB***
Update on 2014-06 by WGB, added SSR-PH13 14 features.***
May 20, 2014. SIP 2013 updates. SP***
April 29, 2014. Alignment of sanitary main adjusted in the area of 118 and 126 William Street as per instructions from W3 manager Troy. Line moved further east within area where existing water main is located. SP***
April 02, 2014, changed object ID 5854 MATERIAL from Null to Unknown. WGB***
February 04, 2014. FAC info updated for 2013. SP***
February 03, 2014 Riversong Phase 5 offsite data added. ST***
December 10, 2013. Heritage Hills phase 2B Segment SAN_MAIN_1109 and SAN_MAIN_1129 moved to ab_sanitary_main ST***
October 23, 2013. Fireside Phase 3 data addded. ST***
October 17, 2013. Riversong Phase 7 data addded. ST***
June 14, 2013. Willows Phase 1 data addded. ST ***
June 06, 2013. Riversong Phase 5 data addded. ST
*** 06 Mar 2013 Added 2 main near Riverstone Condos ST ***
Description: Permanent water flushing assemblies maintained by W3. Requested to be added to GIS by W3 manager in December 2023. Flushing assemblies are used to flush out the associated water main. The flushing assembly is connected to the main via a pipe. These structures contain two valves and hence the schema including two attributes for valve type and size.
M_DeepUT.GIS.HydrantInspections.Water_Proximity
(
type: esriFieldTypeString, alias: Does the hydrant have water within 5' of surface?, length: 10
, Coded Values:
[Y: Yes]
, [N: No]
)
Description: Water valve dataset for the entire Town of Cochrane.Data is appended from CAD during data integration for each construction phase.W3 indicated that the following attributes should have the default values listed:Normal Position - OpenCasing Type - CCap Type - CClose Direction - Clockwise
Service Item Id: 584137686fb341158a743c9b0cdef912
Copyright Text: Update History:
2018-02-07, add features in TW Phase 4 for TCA. wgb
2018-02-06, add features in HH Phase 1MF for TCA. wgb
2018-01-19, added comments to 1 features to review TCA report Q3. wgb 2016-10-20, added RS Ph8. wgb
2016-10-17, added SSR Ph14. wgb
2016-10-14 Updates for Sunset Ridge Phase 19A and 19 O/S PL
2016-08-16 Added 3 new found valves PL
2016-07-20 Added valves in Fireside Phase 5 PL
20150205, added FS Ph4 features and FAC'd them. wgb***
Update: 20140807, added features for Fireside Ph2 data integration on RN1421. WGB***
Updated on 2014-06 by WGB, added SSR-PH13, 21 features.***
May 20, 2014. SIP 2013 updates. SP***
February 04, 2014. FAC info updated for 2013. SP***
October 25, 2013. Fireside Phase 3 data addded. ST*** ****October 17, 2013. Riversong Phase 7 data addded. ST
****July 19, 2013. Removed wat_val_589 as per request from W3 Manager. Attributes of removed valve: diameter = 400mm, install year = 2000, FAC date = 31/12/2001.SP
****June 17, 2013. Willows Phase 1 data addded. ST
****June 06, 2013. Riversong Phase 5 data addded. ST
Description: Water valve dataset for the entire Town of Cochrane.Data is appended from CAD during data integration for each construction phase.W3 indicated that the following attributes should have the default values listed:Normal Position - OpenCasing Type - CCap Type - CClose Direction - Clockwise
Service Item Id: 584137686fb341158a743c9b0cdef912
Copyright Text: Update History:
2018-02-07, add features in TW Phase 4 for TCA. wgb
2018-02-06, add features in HH Phase 1MF for TCA. wgb
2018-01-19, added comments to 1 features to review TCA report Q3. wgb 2016-10-20, added RS Ph8. wgb
2016-10-17, added SSR Ph14. wgb
2016-10-14 Updates for Sunset Ridge Phase 19A and 19 O/S PL
2016-08-16 Added 3 new found valves PL
2016-07-20 Added valves in Fireside Phase 5 PL
20150205, added FS Ph4 features and FAC'd them. wgb***
Update: 20140807, added features for Fireside Ph2 data integration on RN1421. WGB***
Updated on 2014-06 by WGB, added SSR-PH13, 21 features.***
May 20, 2014. SIP 2013 updates. SP***
February 04, 2014. FAC info updated for 2013. SP***
October 25, 2013. Fireside Phase 3 data addded. ST*** ****October 17, 2013. Riversong Phase 7 data addded. ST
****July 19, 2013. Removed wat_val_589 as per request from W3 Manager. Attributes of removed valve: diameter = 400mm, install year = 2000, FAC date = 31/12/2001.SP
****June 17, 2013. Willows Phase 1 data addded. ST
****June 06, 2013. Riversong Phase 5 data addded. ST
Description: At group meeting on 20240110 Manager of W3 stated that there is no need to adjust the alignment of these automatically generated laterals. He is also not worried that some attributes such as Cap Type are NULL/blank (most are the brass plug type).