{ "culture": "en-CA", "name": "", "guid": "", "catalogPath": "", "snippet": "The purpose of this data set is to show the road surface of town owned roads.", "description": "

R<\/SPAN>oa<\/SPAN>d surface was created by tracing on top of aerial imagery.<\/SPAN>Surface type 1 = paved, suface type 2 = gravel.<\/SPAN><\/P>

Road types typically obtained from Transportation Master plan.<\/SPAN><\/P><\/DIV><\/DIV><\/DIV>", "summary": "The purpose of this data set is to show the road surface of town owned roads.", "title": "Road Surfaces", "tags": [ "Road surface", "Road" ], "type": "", "typeKeywords": [], "thumbnail": "", "url": "", "minScale": 150000000, "maxScale": 5000, "spatialReference": "", "accessInformation": "Update History:\n2019-05-07. Updates as per TCA Q4. SP\n2019-05-03, added phase name for paved lanes in Fireside Phase 8 as per 2018 TCA. wgb\n2019-01-15. Added traffic circles and re-aligned along Griffin Road E. SP\n2019-01-09. Added lanes in Sunset Ridge Phase 13 as per TCA Q3 report; added new domains for new phases required by TCA.SP\n2018-12-03. Added in new areas for Q3 TCA. SP\n2018-11-05. Added Sunset Ridge Phase 22, 18B, part of 21; Heartland 6B; a portion of Heritage Hill Phase 5; re-alignment of Griffin Road east from just before Half Hitch Brewery to Spray Lakes Rec Centre, updated road to campground. SP\n2018-10-23. Added HH 1 MF. SP\n2018-06-28. Added some missing alleys in the Willows. SP\n2018-02-28. Missing road segments added related to updates requested by Angie for snow routes all over town. SP\n2018-02-05, add phase name and changed assest #'s Willows Phase 2 & 3 for TCA. wgb\n2018-01-04, add alley RS ph6 for TCA. wgb\n2016-08-22 added portions of road surface in Fireside phase 5 PL\n2016-06-01 applied TCA_Phase_Name domain to PhaseName field, and created SURF_ID field. PL \n2015-11-20 removed a private road out of the town surface. \nUpdate 20141204, added surfaces in HH Ph 3C, Quarry Park , RS Ph6 and FS Ph4. WGB***\nUpdate 20141127, added surfaces in FS Ph3B, 3, 1 and 4 on RN545. WGB****\nUpdate 20141126, corrected road surfaces in SSR Ph13 on RN545. WGB***\nUpdate: 20140807, added features for Fireside Ph2 data integration on RN1421. WGB***\nMarch 19, 2014. Added new segment (rd_777 in back alley of east end as the segment was split from rd_209 as part of the 2013 TCA update. SP***\nMarch 6, 2014. Heritage Hill Phase 1 alleys changed from gravel to paved as per request from Doug in Roads. SP***\nHeritage Hill Phase 2B, Heartland Phase 1, Sunset Ridge Phase 10, Riversong Phases 4, Fireside Phases 1 & 2 Updated by Shazad on Oct 25, 2012", "licenseInfo": "" }